  1. Project : GEDUNG STASIUN DAN JALUR KERETA API (STASIUN TANAH ABANG)
  2. Location : Kampung Bali, Tanah Abang, Jakarta Pusat
  3. Working Supply : AC VRF, Installation
  4. Merk Unit : –   DAIKIN VRF & SPLIT (46 UNIT)
  5. Total Capacity :
        1. IU 800 BTUH / 61 TR.
        2. OU 693.000 BTUH / 58 TR
  1. Start and End  :  18 November 2024 –  31 Dec 2024

This station was built with a building area of ​​23,000 square meters on a 31,743 square meter plot of land.

Phase I of the Tanah Abang Station upgrade aims to transform Tanah Abang Station into a modern transportation hub, capable of serving up to 300,000 passengers daily.

This capacity increase is a response to the high daily passenger volume in the Greater Jakarta area.

In addition, this station also serves two Jabodetabek Commuter Line KRL routes: Cikarang-Tanah Abang-Pasar Senen-Cikarang and Tanah Abang-Rangkasbitung.

This project includes the construction of a new station building, new railway tracks, and the revitalization of the existing 1,489-meter single-track line.