AC Installation

  • GEDUNG COVID & TRAUMA CENTER RSUD NTB PROJECT

    Description Project : PEMBANGUNAN GEDUNG COVID & TRAUMA CENTER   RS  UMUM DAERAH PROVINSI NTB Location : Jalan Prabu Rangkasari Dasan Cermen, Mataram Working Supply : Split AC, VRV System, AHU DX – R.OK Merk Unit             : DAIKIN Split & VRV (517 unit) CLARUSTECH Airpurifier (58 unit) QQ Air (Floor Standing Air Purifier 11 […]

  • RSUD PROVINSI NTB PROJECT

      Description Project : PEMBANGUNAN RS UMUM DAERAH PROVINSI NTB Location : Jalan Prabu Rangkasari Dasan Cermen, Mataram Working Supply : Split AC, VRV System, AHU DX – R.OK Merk Unit             : DAIKIN Split & VRV (517 unit) DAIKIN AHU DX (10 unit) VANCO Fan ( 263 unit) Total Capacity        : […]

  • KANTOR MAJELIS RAKYAT PAPUA (MRP) PAPUA PROJECT

    Description Project : PEMBANGUNAN KANTOR MRP PAPUA Location : Imbi, Jayapura, Papua Working Supply : VRV System & Split Merk Unit : DAIKIN VRV & Split (190 unit) Vanco Fan (111 unit) Total Capacity : IU 559.100 BTUH  / 623 TR OU 556.400 BTUH / 630 TR Start and End                   : Mei 2022 – […]

  • PEMBANGUNAN GEDUNG RS UPT VERTIKAL KUPANG

    Description Project                      : PEMBANGUNAN GEDUNG RS UPT VERTIKAL KUPANG Location                   : j Jalur 40 Manulai, Kupang, Nusa Tenggara Timur Working Supply      : AC Presisi & Installation, AHU & Control R.OK Merk Unit        […]

  • LIPI BOGOR

  • RSUD MANDALIKA LOMBOK TENGAH

  • RS UMUM PATUT PATUH PATJU LOMBOK BARAT

  • RSUD SOEWANDHIE SURABAYA

  • INSTITUT SENI INDONESIA DENPASAR

    Description Project             : PEMBANGUNAN GEDUNG PARKIR, LABORATORIUM   MEDIA REKAM Location : Jl. Nusa Indah, Sumerta, Denpasar, Bali – Denpasar (Kota) Working Supply : AC Merk Unit : – DAIKIN AC VRV System (22 unit) Split Unit (3 unit) Total Capacity             : –    IU 482.400 BTUH / 40 TR –    OU 1.122.000 BTUH […]

  • PEMBANGUNAN GEDUNG LABORATORIUM DAN KULIAH TERPADU, BORNEO

    Description Project             : PEMBANGUNAN GEDUNG LAB DAN KULIAH TERPADU Location             : Universitas Borneo Tarakan Jl.Amal Lama No.1 Tarakan – Tarakan (Kota) Working Supply : AC Merk Unit : – DAIKIN AC Split Unit (69 unit) Total Capacity : – IU/OU 1.122.000 BTUH / 94 TR 6. Start and End        : October 2019 […]