Controller System

  • BTN ECO PARK GANDUL TAHAP 1

    Description Project : BTN ECO PARK GANDUL TAHAP 1 Location : Raya Gandul, Gandul, Kec. Cinere, Kota Depok, Jawa Barat Working Supply : Supply Unit & Installation Merk Unit : –   SAMSUNG VRV & SPLIT (173 UNIT) Total Capacity : IU444.100 BTUH / 370 TR OU 4.731.112 BTUH / 394 TR Start and End             […]

  • GEDUNG STASIUN DAN JALUR KERETA API (STASIUN TANAH ABANG)

    Description Project : GEDUNG STASIUN DAN JALUR KERETA API (STASIUN TANAH ABANG) Location : Kampung Bali, Tanah Abang, Jakarta Pusat Working Supply : AC VRF, Installation Merk Unit : –   DAIKIN VRF & SPLIT (46 UNIT) Total Capacity : IU 800 BTUH / 61 TR. OU 693.000 BTUH / 58 TR Start and End  : […]

  • RSUD Eka Candrarini Surabaya Timur (MERR)

    Description Project                  : RSUD Eka Candrarini Surabaya Timur Location               : Medokan Asri Tengah, Blok RL V, Kalirungkut, Surabaya Working Supply : AC, Exhaust Fan & Installation Merk Unit            : – Daikin AC, VRV System ( 127  […]

  • UIN MALIK IBRAHIM MALANG PROJECT

        Description Project : UIN MALIK IBRAHIM MALANG PROJECT  Location                      : Locari Telekung, Kecamatan Junrejo, Kota Batu Working Supply : AC Split & VRF System, HVAC Installation, Plumbing Hydrant Installation Merk Unit : –    Hitachi & KDK Fan Total Capacity : : –    IU  878.143 BTUH  / 1.573 TR OU 235.596 BTUH / 1.520 […]

  • BALI INTERNATIONAL HOSPITAL (BIH) BALI PROJECT

      Description Project : PEMBANGUNAN BALI INTERNATIONAL HOSPITAL (BIH) BALI Location : Bypass Ngurah Rai No. 126 Sanur, Bali Working Supply : AHU DX, VRV System & Split Merk Unit : –     Daikin AHU DX (32unit) VRV & Split (769 unit) Fan Nicotra & Conexa Total Capacity : IU 048.100 BTUH  / 1.587 TR OU […]

  • BANDAR UDARA KHUSUS PT AMMAN MINERAL NUSA TENGGARA (AMNT) POTO TANO PROJECT

      Description Project : PEMBANGUNAN BANDAR UDARA KHUSUS PT AMMAN MINERAL NUSA TENGGARA (AMNT) POTO TANO Location : Kiantar, Poto Tano Working Supply : VRV System & Split, HVAC Installation, Plumbing Hydrant Installation Merk Unit : –     Samsung VRV & Split (162 unit) Total Capacity : IU 200 BTUH  / 70 TR OU 860.500 BTUH […]

  • BANK NTB SYARIAH MATARAM PROJECT

      Description Project              : PEMBANGUNAN GEDUNG BANK NTB SYARIAH  Location           : Udayana Dasan Agung, Mataram (Islamic Center Mataram) Working Supply : AC Unit, HVAC Installation, Plumbing & Hydrant Installation Merk Unit        : DAIKIN Split & VRV (222 unit) Total Capacity : IU […]

  • TECHNO PARK STP UI PROJECT

    Description Project                         : UIN MALIK IBRAHIM MALANG PROJECT  Location                      : Locari Telekung, Kecamatan Junrejo, Kota Batu Working Supply        : AC Split & VRF System, HVAC Installation, Plumbing Hydrant Installation Merk Unit                   :   […]

  • RSUD PROVINSI NTB PROJECT

      Description Project : PEMBANGUNAN RS UMUM DAERAH PROVINSI NTB Location : Jalan Prabu Rangkasari Dasan Cermen, Mataram Working Supply : Split AC, VRV System, AHU DX – R.OK Merk Unit             : DAIKIN Split & VRV (517 unit) DAIKIN AHU DX (10 unit) VANCO Fan ( 263 unit) Total Capacity        : […]

  • PEMBANGUNAN GEDUNG RS UPT VERTIKAL KUPANG

    Description Project                      : PEMBANGUNAN GEDUNG RS UPT VERTIKAL KUPANG Location                   : j Jalur 40 Manulai, Kupang, Nusa Tenggara Timur Working Supply      : AC Presisi & Installation, AHU & Control R.OK Merk Unit        […]